Drone Leak Investigation · Government & Institutional
Drone leak investigation for schools & universities.
Education portfolios concentrate decades of flat roofs, aging buried services, and — on larger campuses — district heating loops, all maintained by facilities teams whose budgets answer to capital plans, not surprises. Water problems here compound quietly over summers and surface mid-semester, when disruption costs most.
Free phone consult · No pressure · Mon–Sat 8am–6pm PT
Aerial investigation fits the institutional rhythm: portfolio roof baselines flown over breaks, heat-loop surveys in the heating season, irrigation and field drainage mapped before summer programs, and every finding delivered in the prioritised, documented form capital planning processes require.
Where schools & universities leak
- Aging flat roofs across dozens of buildings simultaneously
- Buried heating distribution losing energy invisibly
- Site water mains and irrigation leaking under fields
- Gym, pool, and shop roofs with high-humidity loads
- Deferred-maintenance moisture compounding into envelope failures
The right services for schools & universities
District Energy & Buried Heat Loop Survey
Campus heating loops mapped in one evening — leaks and failed insulation ranked for the dig list.
View servicePost-Storm Portfolio Leak Assessment
The whole district triaged after an event — damage order, not phone-call order.
View serviceUnderground Water Main Leak Survey
Campus mains screened from the air, confirmed by our acoustic ground crews.
View serviceIrrigation System Leak Mapping
Sports fields and grounds — broken laterals found before turf fails and programs cancel.
View serviceSchools & Universities: common questions
When should school portfolios schedule aerial surveys?
Roof baselines over summer or winter breaks when access is simple; heat-loop thermal flights on cool evenings in the heating season when contrast peaks; field and irrigation surveys in the watering season. We build the calendar around the academic one — and around your capital planning submission dates.
How does this support capital planning and facility condition reporting?
Directly: moisture-mapped roof plans with quantified wet areas convert 'Building C roof is old' into 'Building C has 340 m² of saturated insulation; Buildings A and D are dry.' That is the evidence grade that survives budget prioritisation — and defends deferrals on the buildings that genuinely can wait.
Do you coordinate with district facilities and safety requirements?
Always — flights are scheduled with facilities staff, documented for your safety file, and run by Transport Canada-certified pilots carrying the insurance and clearances public-sector sites require. Procurement-friendly quoting and reporting formats are standard for our institutional work.
Other property types
← Drone leak investigation hub·Commercial programs·Government programs
Serving schools & universities across BC
Talk to a leak expert about your schools & universitie
Free phone consult — property, symptoms, and the right survey scope in five minutes. No pressure.