Concrete Scanning · Solar Racking · Rooftop & Deck Equipment

A solar array is a grid of holes in a post-tensioned deck. Clear every one first.

Mounting solar racking or rooftop equipment on a concrete deck means drilling dozens of anchor penetrations — and tower, podium, and parkade decks are very often post-tensioned, where one struck tendon is a safety event and a five-figure repair. GPR scanning clears the full anchor grid before a single foot goes down: tendons, rebar, and conduit mapped and marked, so the array installs on schedule, the anchors hold, and the structure (and the suites below) stay intact.

Full grid
Whole array cleared per visit
PT drape
Tendons mapped & marked
Decks
Roof · podium · parkade
Since 1999
BC concrete experience

Free phone consult · No pressure · Mon–Sat 8am–6pm PT

Rooftop & deck anchoring we scan for

How a deck array clearance runs

  1. 1

    Lay out the array

    The racking or equipment anchor grid is set out on the deck to your drawing — the penetration pattern we clear, foot by foot.

  2. 2

    Scan the grid

    GPR maps post-tension tendon drape, rebar, and conduit across the deck, with depth context to the anchor embedment so both path and depth are clear.

  3. 3

    Mark or shift each foot

    Each anchor point is marked clear, or nudged within tolerance to miss a tendon or bar while holding the array's structural and edge requirements.

  4. 4

    Install on schedule

    Your crew drills the cleared grid the same mobilisation — no tendon strikes, no aborted holes, no field-relocations that compromise waterproofing. Engineer record where required.

Part of the concrete scanning practice

Rooftop array clearance is one application of our concrete scanning service. For general fastener work see anchor & dowel scanning; for coring and cutting, scanning for contractors. Where the deck membrane itself is in question, see podium deck investigation. Background: cost and depth & accuracy guides.

Solar & rooftop scanning, answered

Why scan a concrete deck before installing solar or rooftop equipment?

Solar racking and rooftop equipment mean drilling a grid of anchor penetrations into a structural concrete deck — and those decks, on towers, podiums, and parkades, are very often post-tensioned. A single anchor into a post-tension tendon is a serious safety event and a $20,000–$75,000+ repair; into a conduit it's an outage. GPR scanning clears every anchor location first, so the array goes down on schedule, the anchors hold, and the structure stays intact. It also protects the deck's waterproofing strategy by keeping penetrations where they belong.

Are rooftop and podium decks really post-tensioned?

Frequently, yes — post-tensioned slabs have been standard in BC towers, podiums, and parkade decks since the early 1970s, and a roof or amenity deck over occupied space is often exactly that. That's precisely why blind anchoring into these decks is so dangerous: the tendons are stressed to 15–20 tonnes each and follow a draped profile you can't see from the surface. We map that drape and mark keep-clear zones before any rack foot or equipment anchor is drilled.

Can you scan the whole array layout efficiently?

Yes — solar and equipment anchoring is high-volume drilling, so we scan it as a batch. A day rate clears the full anchor grid in one mobilisation, with each foot location marked clear or shifted to miss reinforcement while preserving the layout's structural and edge-distance requirements. That's far more cost-effective than per-anchor callouts, and it keeps the install crew moving across the deck without aborted holes.

What about conduit and embedded services in the deck?

Rooftop and parkade decks carry conduit, drainage, and sometimes radiant or snow-melt lines embedded in or under the slab. GPR distinguishes these from reinforcement and marks them, so an anchor penetration doesn't cut a live conduit or breach an embedded line. For decks with radiant or hydronic embeds the scan is especially valuable — those lines are expensive and disruptive to hit.

Does scanning help protect the deck waterproofing too?

Indirectly but importantly — by confirming exactly where anchors can go, scanning keeps penetrations to the planned, properly-flashed locations instead of forcing field relocations that compromise the membrane. On podium and amenity decks over occupied space, where a botched penetration becomes a leak into the suites below, knowing the clear anchor points before drilling protects both the structure and the waterproofing. Pair with our envelope and deck investigation services where membrane integrity is in question.

Do you provide a record for the engineer or installer?

When required, an annotated record of cleared anchor locations against the reinforcement and embed map — the deliverable a structural engineer or solar EPC often conditions the penetration permit on. It's quoted up front as part of the scope. Routine clearance, though, is same-visit scan-and-mark so the install proceeds without delay.

Serving Metro Vancouver, Victoria, the Fraser Valley, and all of BC.Concrete scanning hub·All services

Put the array down without putting a hole in a tendon.

Free phone consult — deck type, anchor count, and a firm grid-clearance quote in five minutes.